Western Power HQ
Western Power engaged Addelec to install, supply
and maintain electric vehicle charging stations
across three locations - Murrary Street, Forrestfield
and Albany.
The project included:
• Installation and supply of 15 electric vehicle
chargers and a load management system at their
Murrary Street HQ
• Installation and supply of 22 dual socket chargers
and a load management system at their
Forrestfield Depot
• Installation and supply of 5 dual socket chargers
and dedicated load management at their Albany
depot
Cloud Carrier Data Centre
Recently, Addelec began a comprehensive project
for a client, focusing on the full electrical design and
installation for a major data centre in Australia.
The project included:
• Engineering and designing the high-voltage (HV)
network
• Provision and installation of HV cables
• Equipping the site with HV switchgear
• Setting up comprehensive battery systems
• Designing and implementing earthing systems
• Installing and integrating the substation
automation network
• Performing a detailed protection study
for the HV setup
• Comprehensive project management services
• Commissioning, including HV switchgear,
transformers, battery systems, and substation
automation components